Type |
GJS-M5/RS-AS |
Size |
F190*316 |
Cable ports (inlet/outlet) |
3 in/ 3 out |
Cable diameter (mm) |
F7~F20 |
Splice tray capacity |
24 (single core) |
Max splice tray number |
4 |
Max core capacity |
96 (single core) |
Max splitting |
1:4 (4pcs), 1:8(2pcs), 1:16(1pc) |
Sealing type |
Heat shrinkable sleeve, silicon rubber |
Technical Index
- Fiber radius of curvature:≥40mm
- Optical disk additional loss: ≤01dB
- TemperatureRange: – 20°C ~ + 60°C
- Anti lateral pressure: ≥2000N / 10cm
- Shock resistance:≥20N.m
- Protection level:IP65
INSTALLATION PROCESS
1. Cable installation
① Open the hole:Saw the entry ports as need.
② Clean the cable sheath with cloth(about 1.4 meter)
③ Slide the cable into the hole.
2. Cable preparation
① Strip the cable sheath, clean the filing, cut the cable reinforced core at 75mm distance from the sheath cut;
② If a shielded cable is installed, leave a cable shielding layer of approximately 25mm x 25mm in the axial direction at the annular cutout of the cable and clamp the shielded cable;
③ Cut off the loose tube at 35mm from the annular section of the optical cable, remove the oil on the optical fiber bundle, put on the bare fiber protection tube.
④ Align the cable section and the base hole end, insert the reinforced core into the fixing hole, squeeze it with a nut and cut off the excess;
⑤ If shield wire is used to connect 2 cables, the cables should be paired together according to the outlet order.
3. Oval hole sealing
① Wipe the elliptical surface and cable sheath with a clean piece of paper or cloth to a distance of 100mm from the edge of the hole;
② Rough the elliptical surface and cable sheath with sand paper, clean them with cloth;
③ Put on the elliptical heat shrinkable tube, and mark the optic cable on the end of the tube;
④ make the 2nd mark on the cable at 5mm from the 1st marker;
⑤ Wrap the cable with warm aluminum paper from the 2nd mark;
⑥ When install the 2nd cable, allocate the heat shrinkable tube according to the cable size, insert the branch card (note: all the branch cards should be fully inserted into the heat shrink tube)
⑦ Heat the heat shrink tube with a torch so that it shrinks all over the holder and cable, then heat the clips on both sides until the hot melt flows out of the two cables.
4. Optic Cable installation
① Each splice tray holds a maximum of 24fiber joints, and holds up to 2 bare fiber protection tubes on each side of the tray, marking each tube at a 15mm distance from the edge of the splice tray;
② Carefully cut off the extra protection tube at the mark and secure the tube to the tray with a strap.
5. Optical fiber connection and storage
① Connect the corresponding fibers according the requirement;
② Place the fiber joint in the card slot of the splice tray, coiled the remaining fiber in the tray;
③ Check if all fibers are intact, then cover the transparent lid and fix it to the splice tray.
6. The box installation
Place the box cover on the box base, tighten them together through locking ring, install it by wall mounting or pole mounting.